10 day closure in place
The exit on to Broadway from Douglas Promenade will be closed to traffic today (1 June).
It's to allow for the final highway surface to be laid and for roundle markings to be installed.
The junction will be closed for around 10 days after which the exit lane will be reinstated.
Broadway is due to fully reopen to vehicles turning off the prom by mid-July.
Manx Radio's Ewan Gawne reports from the scene:
Port St Mary father continues to fight for change in drug laws
Driving ban for man caught drug driving at the Sea Terminal
'Really important' children are inspired to use their imaginations, says Manx author
