Traffic still restricted as DoI awaits design
The re-opening of the Ramsey Swing Bridge to vehicular traffic would appear to still be some way off.
The Victorian bridge has been closed to traffic since January, though pedestrians can still cross.
The Department of Infrastructure imposed the partial closure following a survey which revealed areas of concern with parts of the deck structure.
In its latest update the department says it's still awaiting a design before repair work can go ahead.
As a result there's no fixed timescale for the re-opening of the bridge.
Rolling delays see Manxman sailings cancelled
Assisted dying bill receiving 'due attention it deserves' in UK
Faulty device believed to have triggered multi-agency search effort
Payroll firm reprimanded after thousands of personal records discovered in abandoned shredding bins
